Please note SF Bar Pilots have announced this afternoon that the controlling depth in the Pinole Shoals channel has been increased to 34.4 ft BW at MLLW following a new analysis and interpretation of the survey conducted after recent dredging was completed
This is a increase of .7 feet from the previous controlling depth of 33.7 ft BW at MLLW and is .1 ft lower than the controlling depth of 34.5 ft BW at MLLW before dredging .
Taking in to account the 3 foot UKC tank vessel transit...
Read the rest of the article at bridge-log.com